PDL engineers supported a world leader in subsea umbilical solutions to assess the suitability of a new design of chute for the installation of umbilicals. The new roller chute was designed with the intention of reducing friction when installing umbilicals.

The engineers were responsible for conducting dynamic 3D finite element analysis (FEA) on a range of umbilical designs, using the Abaqus software package. The purpose of the analysis was to determine whether the deformation and stresses in the umbilical components was within acceptable limits when the umbilical was wrapped around the new chute design under tension.

 Roller Chute

 

 

 

 

 

 

 

 

 

This document will download automatically, click here if nothing happens within 10 seconds.

Posted: 19th Aug 2015 in 'PDL Case Studies'
« Go back to publications list

Access Key Enabled Navigation

Keywords for: PDL Case Studies | Roller chute for the installation of umbilicals

PDL, subsea, umbilical, chute, installation, roller chute, friction, Abaqus, FEA, deformation, PDL, PDL Group, PDL Solutions, reduce development costs, mitigate risk, engineering design analysis, consultancy services, Global dynamic analysis, Orcaflex, Finite Element Analysis, FEA, Computational Fluid Dynamics, CFD, Engineering Design, CAD, Multibody Dynamics, RecurDyn