PDL Engineers supported the RPS (Riser Protection System) project which was in operation around a gas platform in the North Sea.  The RPS is a mooring system deployed in the North Sea to act as a visual deterrent for approaching vessels.

Global set up of BBRPS 8 point mooring system

PDL engineers spent a number of weeks on site at Aberdeen, Scotland as part of the customer's offshore design team. The work was carried out in in OrcaFlex® Global analysis software. The protection system consisted of an eight point mooring system made of chain and polyester rope attached with spar and pull-through buoys at the surface.  PDL engineers were responsible for assessing the ULS (Ultimate Limit State) and FLS (Fatigue Limit State) of the existing system.

Riser Protection system

The RPS was currently deployed at the platform and the fatigue life requirement for the system was not being met. In order to understand the current system and generate an effective solution, PDL’s first task to was to ascertain what caused the existing system to fail. This involved creating an ‘as built’ model of the system, including all details of spar buoys, pull-through buoys and accurate representations of all structural components, master links and shackles.

 

Once the base system had been replicated, a range of environmental conditions were applied to the model using input macros. Irregular wave theory (JONSWAP) was used to run multiple analyses, accurately modelling North Sea storm conditions and capturing the tensions in the system. To order to reduce run time and estimate a design life for the system, 1, 10 and 100 year return period storm conditions were used to analyse the system. Results for submergence, grounded length, contact forces and tensions were extracted. Multiple environmental directions were run and results collated to determine the suitability of the system. This included the detailed assessment of each component’s expected fatigue life.  This allowed the reason for the failure of the initial system to be accurately and confidently understood.

PDL iterated the design and configuration of the system to deliver an acceptable solution which met the customers’ requirements.

PDL engineers delivered the project in half of the allocated time and schedule allowing for faster deployment of the revised mooring system.

Access Key Enabled Navigation

Keywords for: Oil & Gas | Riser Projection System

RPS, Riser protection system, gas platform, North Sea, PDL Engineers, Design consultancy, visual deterrent for approaching vessels, Aberdeen, Orcaflex, global dynamic analysis, eight point mooring system, Ultimate limit state, fatigue limit state, Irregular wave theory, JONSWAP, multiple analyses, modelling North Sea storm conditions, submergence, grounded length, contact forces, PDL, PDL Group, PDL Solutions, reduce development costs, mitigate risk, engineering design analysis, consultancy services, Global dynamic analysis, Orcaflex, Finite Element Analysis, FEA, Computational Fluid Dynamics, CFD, Engineering Design, CAD, Multibody Dynamics, RecurDyn